Power Management

Products Category

Featured product

Clear All
Apply
Filter
4 Columns List
APC AP8870 Metered Rack PDU, 30A, 100/120-200/240V, 16 NEMA 5-20R, 12 C13, and C19 Outlets, ZeroU RMS
APC AP8865 Rack PDU, 2G, Metered, ZeroU, 8.6kW, 208V, 36 C13, C19, and NEMA 5-20R Sockets
APC AP8861 NetShelter Rack PDU, Metered, 0U, 5.7kW 208V 3-Phase 20A, (36) C13, (6) C19, and (2) NEMA 5-20R Outlets
APC AP8861 NetShelter Rack PDU, Metered, 0U, 5.7kW 208V 3-Phase 20A, (36) C13, (6) C19, and (2) NEMA 5-20R Outlets
APC AP8858NA3 Power Distribution Unit Cord, 20-Outlet
APC AP8853 NetShelter Metered Rack PDU, 0U, 1PH, 7.4kW 230V 32A, 36 C13 and C19 outlets, IEC 309 2P+E cord
APC AP8853 NetShelter Metered Rack PDU, 0U, 1PH, 7.4kW 230V 32A, 36 C13 and C19 outlets, IEC 309 2P+E cord
APC AP8841 Rack PDU, 2G, Metered, ZeroU, 30A, 200V and 208V, 36 C13 and C19 Sockets
APC AP8832 Rack PDU, 2G, Metered, ZeroU, 30A, 100V to 120V, 24 NEMA 5-20R Sockets
APC AP8831 Rack PDU, Metered, ZeroU, 15A, 100-120V, (10) 5-15
APC AP8830 Rack PDU, 2G, Metered, ZeroU, 20A, 100V to 120V, 24 NEMA 5-20R Sockets
APC AP8641 Rack PDU, 2G, Metered by Outlet, with Switching, 30A, 200V and 208V, 21 C13 and C19 Sockets
APC AP8632 APC Rack PDU, 2G, Metered by Outlet, with Switching, 0U, 30A, 100V to 120V, 24 NEMA 5-20R Sockets

Power Management Equipment For AV, Network & Security Systems

Build out equipment racks, control systems and always-on electronics with a focused selection of power management equipment for AV, network and security systems. This collection includes power distribution, backup, conditioning and monitoring components for replacement, expansion and new-system planning. Before choosing a product, define its role in the overall system and identify the equipment, cabling, mounting or control requirements it must work with.

How to Choose Power Management

Choose by system requirements first. Key points to compare include total load, outlet configuration, backup needs, remote management, rack space and equipment power requirements. For retrofit work, document the equipment already installed and verify interfaces before changing components. That approach helps avoid purchasing hardware that is technically capable but not appropriate for the specific installation.